Remko RKS 435 H Manual de usuario Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 20
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9

Ensure a continuous, unim-
peded air supply from outside,
if possible through opposite air
openings of sufficient size.

Comply with any static and
other structural regulations
and conditions for the building
and provide sound insulation if
necessary.
Minimum clearances
The diagram below specifies the
minimum clearances for fault-free
operation of the units.
These protection zones allow
unimpeded air inlet and outlet,
ensure sufficient space for mainte-
nance and repairs and protect the
unit against damage.
RKS 435H RKS 448H
A 100 mm
B 700 mm
C 400 mm
D 100 mm
E 200 mm
Oil return measures
If the outdoor unit is positioned at
a higher level than the indoor unit,
appropriate oil return measures
must be put in place. This normally This normallyThis normally
involves creating an oil lifting bend
for each 2.5 metre rise.
Oil return measures
Installation
The instructions below describe
the installation of the refrigerat-
ing circuit and of the indoor and
outdoor units.
1. For the required pipe cross-sec-For the required pipe cross-sec-
tions, refer to the “Technical
data” table for the outdoor
unit.
2. Install the indoor unit and con-Install the indoor unit and con-
nect the refrigerant pipe as de-
scribed in the operating manual
for the indoor unit.
3. During installation, observe theDuring installation, observe the
bending radii of the refrigerant
pipes and never bend a section
of the pipe twice.
This can result in brittleness and
a risk of cracking.
4. Lay the refrigerant pipes fromLay the refrigerant pipes from
the indoor unit to the out-
door unit. Ensure that they are Ensure that they areEnsure that they are
adequately secured and make
suitable provision for oil return!
5. Install the outdoor unit withInstall the outdoor unit with
wall or base bracket on sections
of a building that are statically
approved for this purpose.
Follow the installation instruc-
tions for the brackets.
6. Ensure that no structure-borneEnsure that no structure-borne
noise is transmitted to sections
of the building. Transmission of
structure-borne noise is reduced
by vibration absorbers!
7. Remove the factory-fittedRemove the factory-fitted
protective caps and the screw
caps on the blocking valve con-
nections and use them in the
subsequent installation.
8. Make sure that the screw capMake sure that the screw cap
is fitted onto the pipe before
bordering the refrigerant pipes.
9. Process the laid refrigerantProcess the laid refrigerant
pipes (Figure 1+2).
Installation may only be per-
formed by authorised special-
ist personnel.
NOTE
Minimum clearances
Air inlet
E
C
B
A
D
Air
outlet
Outdoor unit
Oil lifting bend
in suction pipe to
outdoor unit,
1x per 2.5 metre
rise
Radius:
50 mm
max. 8/10 m
Outdoor unit
Refrigerant pipe
Deburrer
1
Deburring the refrigerant pipe
Bordering tool
2
Bordering the refrigerant pipe
REMKO RKS
10
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 19 20

Comentarios a estos manuales

Sin comentarios