
10
REMKO KPS 300
Heat pump supply line
5/4“ AG
Heat pump return line
5/4“ AG
Heating circuit supply
5/4“ AG
Heating circuit return line and
emptying through customer-
provided T-section 5/4" AG
Optional: Electric booster
heating (immersion
heating) 6/4" IG
Immersion tube
for temperature sensor
Cleaning flange or
opening for fin-tube
heat exchanger D180
(special accessory)
Top 1" AG connection,
for: venting, safety group
Variant 2: Heat pump located to the
left of the storage tank
Commissioning
1.
Check all connections, even those
which were sealed at the factory
(flange), for leak-tightness.
2 Then check all pipes for any leaks
and, if necessary, fix them.
Commissioning should only be
performed and documented by
specially trained personnel.
NOTE
3
.
Test the safety module and valves
for function.
4. During the heating process, all
expansion water generated in
the tank must be captured by an
appropriate expansion vessel.
Comentarios a estos manuales